Project EIR N60 Ronse

13.18
From 2014 to 2015
The aim of this project was to complete the main road structure at the Flemish level and connect it properly to the local road network, so that this has a positive effect on the accessibility, liveability, and road safety of Ronse. In this study assignment, an environmental impact report or project EIR was elaborated for the realisation of this project.

TML elaborated the Human-Mobility aspect in this project EIA. The reference design was assessed in the light of a number of indicators concerning the functioning of the road network, accessibility, multimodal mobility, traffic liveability, and road safety.

Period

From 2014 to 2015

Client

Agency of Roads & Traffic (AWV)

Partner

/

Our team

Dirk Engels, Gitte Van Den Bergh
© 2025 Transport & Mobility Leuven | Westsite: Online Oplossingen en Webdesign